First Phase
We started to lay the test track from the foot bridge through the tunnel.
This is were we started to dig out from. You can just see the pile of track
panels on the left side. The rail was rolled to the curve of the track then
bolted down with the clips to sleepers.
This photo was taken of the top of the tunnel
Chris our club treasurer doing his bit
Garry and Steve 2 fitting some fish plates at a joint.